Friday, November 15, 2013

So many shades of green

but I still didn't have the right one so had to go and buy the one at the top. Done the maths, rods every 12cm, let the sewing commence

Thursday, November 14, 2013

Cutting out

and doing the maths, only 2 strips left to do. Next project for the Towers (DD & HP) residence

PS HP = her partner

Sunday, November 10, 2013

Windows seat

Patched, quilted, assembled and delivered. It's huge, nearly two metres long. Vast! The recipients had okayed a few of the fabrics but left the design to me. They were very happy.

Its filled with memory foam base, double layer wadding & an old sleeping bag. Its an envelope construction closed with Velcro.

Onto the next commission ....